中文 English
Chongqing Longway Control System Co.,Ltd

Congratulations to Guigang Iron and Steel on the successful commissioning of the 2 * 108 ㎡ sintering flue gas desulfurization and denitrification project system!

Addtime:2020-10-22 | Click:3636


  Guigang Steel's 2 * 108 ㎡ sintering flue gas desulfurization and denitrification project covers an area of 1400m2. After the sintering head flue gas electrostatic precipitator+limestone wet desulfurization+wet electrostatic precipitator system, new SCR system, GGH heat exchange system, ammonia water storage and supply system, flue gas heating system, online monitoring system, and electrical instrument control system will be built.


1619081047840410.jpg


  The project aims to transform environmental protection measures to ensure that the emission concentration of nitrogen oxides in the flue gas of the sintering machine head meets the requirements of the "Opinions on Promoting the Implementation of Ultra low Emissions in the Steel Industry" (Huanda Atmospheric [2019] No. 35). The total investment of the project is about 62 million yuan, all of which are environmental protection investments. 

                                                     1619081102106434.jpg


  At present, the sintering flue gas desulfurization and denitrification project has entered the stage of system operation and commissioning, and the stage test data has reached the expected values. The project adopts high-quality signal isolators supplied by Chongqing Langwei Instrument Co., Ltd. to provide effective guarantee for the stable operation of the system.




2024-2027©Chongqing Longway Control System Co.,Ltd Copyright Filings:渝ICP备2021001067号-1 Technology:Yunwei Technology

Statement: Part of the content and pictures of this site are from the Internet. If there is infringement, please contact the administrator to delete it. Thank you!